Summary Statement
Whenever multiple tower cranes are used, there needs to be preplanning to ensure that the tower cranes cannot hit each other loads. This is accomplished by setting swing restrictions, marking the ground for allowable crane travel and training of the crane signal persons.
August 28 2015
Images, Cranes & Hoists, Laborer, Operating Engineer, Structural Ironworker, Commercial & Institutional
Metropark
i002687